home
products
technological equipments
quality management
feedback
 
flour-milling machine
   
Small single machine
  6FY-30 style
  6FY-35/40 style
  6FZX-30/35 style
  6FZS-35/40 style
  6FZD-35/40 style
  6FZ series pneumatic lifter
  6FTY-8 style small set of mill
  6FTY-10 style small set of mill
Complete sets of equipment
  6FTY-15 style
  6FTY-18B/C style
  6FTY-19/25 style
  6FTF-30 style
  6FTYF-22/32 style
  6FTF-38 style
  6FTF-40 style
  6FTF-50 style
  6FTF-50B-1 style
  6FTF-60 style
  6FTF-80 style
  6FTF-100 style
  6FTF-120 style
  6FTF-150T style
  6FTF-200T style ( movie )
  6FTF-250T style
  6FTF-300T style
  60T-230T photo
Necessary eqipment
  SDQ-25 style combined cleanning machine
  6XM style stone-removing whizzing washer
  PH-40(50) style grain separator
  TQSF dry stoner
  FSF-2x10 plansifter wity two nest of sieve
  FDMW-30x60 style scourer
  Series of alloy roller
   
 
   
 
6FTY-10 STYLE AMALL SET OF MILL
 
 
     
   
 
6FTY-10 STYLE SMALL SET OF MILL
 
  The technological process is advanced and the output of cn.h is high. The screenroom adopts one sifter, one beater, two scourer, one stoner and one dampering. the purifer adopts two sets of 6FY-35 style flour-milling machine, four sets of reel separator and one set of air net, the structure is compact and nice appearance.
     
   
 
1.Manual of design
 
 

With the development of world economy and acceleration of circulation of grain, the nwe situation of grain-processing have been taken on and the small-scale,low investment products have been wecomed by the vast village. So our plant decides to disign a new and small-scal unit which can cater to the need of the current market.

6FTY-10 small-scale unit, low investment and high efficiency, is a small complete set of equipment which can produce continuously. It is the epitome of the big unit and the design is principle,operation is simple, repairment is easy and cover little area. The main feature is :

1/ Two sets of mill can produce continuously and process the wheat 10 ton within 24 hours.
2/ The flour can be adjusted according to the market's requirment, F1 flour, F2 flour and standard flour can be produced.
3/ The covering area: LxWxH=6.6x3.8x3.5(m)
4/ Power consumption low the state standard, the total power is: 26.5KW.
5/ The tempering tank includes two parts, the size of each tank is: LxWxH=0.9x1.5x1.5(m)

The technolgical process is advanced and the output of cm.h is high, the screenroom adopts on sifter, one beater, two scourer one stoner and one dampering. the purifier adops two sets of 6FY-35 style flour-milling machine, four sets of reel separator and one set of air net. the structure is compact and nice appearace.

     
   
 
2. The main technical targets
 
  1/ Output: process 10T wheat within 24 hours
2/ Extraction flour : when the quality of the wheat conform the stipulation of China GB1351-86 <wheat> the volume weight is over 770g/L
F1 flour :60%
F2 flour 70%
standard flour: 78%
3/ Quality of the flour: conform the stipulation of China GB1355-86 <wheat flour>
4/ Total power: 26.5KW, the voltage: 380V;50HZ.
5/ Water content: add 2-3 percent water to the wheat according to the water content of raw wheat.
     
   
 
3. The main equipment and techlogical process
 
  The main equipment:
No
Name of equipment
Specification
Number
1
6FY-35
two sets
2
6-23NO-5C
one set
3
8-18NO-4A
one set
4
30 style
four sets
5
QS-40
one set
6
scourer
6NF-90
two set
7
GFY-150
four sets
8
sliding separator
30 style
one set
9
auger
150x1000
one set
10
beater
20
one set
     
   
 
4. Requirement for raw material
 
  1/ It is the best when the volume weight of the wheat is 750-820g/L.
2/ The organic and inorganic impurity mixed into the wheat must not surpass 1.5%
3/ The metal contained in the net wheat must not surpass 0.02%
4/ The moisture content for the soft wheat prior to milling must not surpass 14.5%, but for the hard wheat, it must not 15%, when the moisture content is too high, the output and extraction flour shall be reduced.
5/ Time for tempering the wheat: 24 hours must be ensured to the soft wheat, 36-40 hours must be ensured to the hard wheat, otherwise, it will affect the quality of the flour.
6/ The extraction flour is low and the quality of the flour is not good for the new wheat, so the new and old wheat should be mixed.
     
   
 
the technological process in screenroom and purifier
 
 
     
   
 
5. Requirement for operation
 
 

A. Preparation before working and operating order.

1/ Checking items before working the machine.
(1) Whether the driving belt is in the working state and the protective equipment is firm.
(2) Whether the inside of the machine has tools and other impurities.
(3) Whether the bearing has enough lubrication.
(4) Whether all parts and all procedures are in the working state.
(5) Whether the air-pipe, sliding pipe and feeding pipe are in the working state.
(6) Whether the water, water channel have been prepared well.
(7) Whether the roller is loose and the clearance of the roller is proper and the clutch is nimble.
(8) Whether the change direction of all parts is right.
(9) Whether the part is loose and the tension of the belt is proper.

2/ The following situation must be known before woking the machine
(1) Whether the voltage is normal and the Joint for electric conduction is good.
(2) The sorts, quality and the moisture content of the wheat.
(3) Requirement of the time of dampering.
(4) Order for working the machine.

3. Order for working the machine.
(1) Switch on the total switch.
(2) Working order in screenroom: fan-beater-scourer-stoner-auger;
working order in purification: fan-reel separator- 1# flour mill machine-2# flour mill machine.

B. Points for attention during the working:
1. The flow for each parts should be even and steady.
2. Pay attention to the flow of every mill and control the microadjusting device on the 1# flour milling machine, adjust the extraction flour of F1, F2 and standard according to the requirement of the technological process.
3. During the operation, the extraction flour must be controlled strictly in the front scheme and make it reach the stipulated targets. The burden of each parts should be even. Besides, pay attentions to the flow in the last times and adjust the flow in time so as to ensure the steability for the quality and extraction flour and reduce the bran content in the flour.

     
   
 
6. The question during the course of producing and the method to settle
(the breakdown of single mill, please see the operation instruction of its own)
 
 
Problem The cause The method of settling
1. the extraction rate is low

1. the quality of the wheat is bad
2.The moisture content of the wheat is too much.
3.the area of sifting is little, the silk is loose.
4. the rolller is used for a long time.
5.the flow is unbalance, the extraction rate in front is high, in back is low.
6.the length of grinding is not long enough or leak the stock.
7. the time for moistening is short.
8. the pressure of air net's branch is unbalance.
9. the peculiarity of the bran roller's surface reduction roller's surface, scratch roller's surface is not suitable.

 
     
     
     
     
     
     
     
     
     
     
     
     
     
     
   
 
7.Installation and adjustment.
 
 

1. Installation: Usually we shall send the engineer to install, but the customer can install it according to the installing drawing and operation instruction.
2.Adjustment:
(1) The machine must be running unloadly for half an hour before working. then stop it and chech completely whether the equipment produce friction and jump, whether the screw is loose and the V-belt is too loose or too tight. Continuous running unload till the machine is normal.
(2) When operate the machine, the flow must be increased gradually untill it reach the requirement of design, otherwise the feed can be blocked or dropped.
(3) The quality of the flour must be ensured first during the working, then the extraction flour and the output may be considered, Don't seek the output only while neglect the quality.
(4) After producing for a long time, you must sum up the experence.

     
   
 
the production-line especially for producing mill
 
 
the production-line producing the case of the mill
the production-line for puttying up the putty
the assembly line for mill
the production-line for spraying paint and kiln-drying paint
the centre for milling and boring imported from German
computer CAD system
     
 
 
Flour mill contact: Xu Haitao (Mr)
Company: Nanyang Guanghui flour machinery factory
Address: No 12 GuangWu east road Nanyang city Henan province, China.
E-mail: sales@cnnygh.com
E-mail: business@cnnygh.com
Tel : +86-377-63283232
Fax: +86-377-63220891