home
products
technological equipments
quality management
feedback
 
flour-milling machine
   
Small single machine
  6FY-30 style
  6FY-35/40 style
  6FZX-30/35 style
  6FZS-35/40 style
  6FZD-35/40 style
  6FZ series pneumatic lifter
  6FTY-8 style small set of mill
  6FTY-10 style small set of mill
Complete sets of equipment
  6FTY-15 style
  6FTY-18B/C style
  6FTY-19/25 style
  6FTF-30 style
  6FTYF-22/32 style
  6FTF-38 style
  6FTF-40 style
  6FTF-50 style
  6FTF-50B-1 style
  6FTF-60 style
  6FTF-80 style
  6FTF-100 style
  6FTF-120 style
  6FTF-150T style
  6FTF-200T style ( movie )
  6FTF-250T style
  6FTF-300T style
  60T-230T photo
Necessary eqipment
  SDQ-25 style combined cleanning machine
  6XM style stone-removing whizzing washer
  PH-40(50) style grain separator
  TQSF dry stoner
  FSF-2x10 plansifter wity two nest of sieve
  FDMW-30x60 style scourer
  Series of alloy roller
   
 
   
 
FAMOUS PRODUCT OF CHINA
 
 
6FTF 50TB-1 STYLE COMPLETE SETS OF EQUIPMENT PROCESSING GRADATIONAL FLOUR ( Page 1 Page 2 )
 
First pass through the ISO9001 quality system certification
in the line of making flour in China
 
  1.The general situation:
  This complete sets of equipment is developed basing on the develop of international market's economy, Its feature is that the scheme of the flour is long, which adopts break system, scratch stytem and reduction system and make the flour evenly and completely, so the extraction flour is high, the flour is fine, the colour is good, the glutenin is good, it can make several sorts of flour, Convey the stock with pneumatic lift in purifiers, in screenroom adopts bucket elevator, the result of dry cleaning the raw wheat is good and the workshop is saintary.
     
   
  2.The main technical economic parameters:  
 

1' Output: process the wheat 50T per day.
2' extraction flour: when the quality of the wheat conform the stipulation of China GB1351-86<<wheat>>(the volume weight is over 770g/L)
The total extraction flour of F1 flour, F2 flour and F3 flour is over 75%.
a. respective extraction flour: F1 flour:60-63%, F2 flour: 70-73%, F3 flour:78-80%.
b. Combined extraction flour between F1 flour and F3 flour: The total extraction flour is over 75%. between them, F1 flour is 30%, F3 flour is 45%.
c. Combined extraction flour between F2 flour and F3 flour : The total extraction flour is over 75%. between them :F2 flour is 45%, F3 flour is 30%.
3' The quality of the flour: Conform the stipulation of China GB 1355-86<<wheat flour>>.
4' The total power: 177.2KW, power consumption per ton wheat:68KW*h, the voltage: 380V*50HZ.
5' The total area of the workshop is about 435.2 square mekre, (27.2*3*4.5 two storeys). It adopts 6 sets of pneumatic mill of FMFQ-40 style, the total length of the rollers is : 40*60*2=480cm.
6' The volume of adding the water: depending upon the moisture content of raw wheat, usually temper to 3% moisture, it needs 1.5T water in 24 hours.

     
   
  3.Technological process:  
 

1' The part of cleanning the wheat: adopt technology of dry cleaning: three siftering, two scourer, two stoner, one magnetic separator, two damper, second tempering the wheat.

The technological process of cleaning wheat is following:

2' The technology of making flour: It adopts new technological process" of 4B. 4C. 3R", grade with plansifter, extracte the flour with plansifter, which can improve the extraction flour, ensure the quality of the flour.

The figure of the technological process of making flour is as following.

     
   
  4.Technological process:  
 

1' Weight: about 50T
2' Bulk: 160 M3
3' The number of the container: 9 contanerers(20 feet)

     
   
  5.The number of the workers:  
 

Every shift needs 10 workers(It needs 3 shifts per day, so needs 30 workers) Including 2 workers in screenroom, 3 workers in purifiers, 1 workers for mixing the wheat, 1 workers for repairing and controlling the electricity, 3 workers for bagging ( excludes laboratory techician, purchasing and saling person, accountant and managment)

     
   
  6.install, adiust and teachnique training:  
 

The customer can install, dajust the equipments by oneself, If needs our plant to guide install, adjust, the customer should send a invited letter to our plant, we can send 2-3 technicians to help install and adjust and the time of installing, adjusting is 90 days the workers can attend to the actions of installing, adjusting, during the training, we also give the lessons to the workers.

     
   
  7.The time for delivery:  
 

After sign the contract and we receive payment in advance of 30% the total amount of the contract, we begin to produce and can deliver the equipment in 60 days in our plant.

     
   
 
The list of the main equipments in screenroom
 
   
 
NO The name and model of the equipment QTY REMARK
1 PH-50*2 grain separator 3 contain motor
2 FDMW 30*60 style scourer 2 contain motor
3 FZSH 24*160 intensive damper 1 contain motor
4 QS56 gravity stoner 2 contain motor
5 C*P30 magnetic separator 1 contain motor
6 150*7800 spiral conveyor 4 contain motor
7 Ø 150*2000 spiral conveyor 1 contain motor
8 Ø150*5000 spiral conveyor 2 contain motor
9 DTG26/11 elevator 5 contain motor
10 4-72-4.5A low pressure fan 1 contain motor
11 low pressure dust pipes 1  
     
   
 
The list of the main equipments in purifiers
 
   
 
NO The name and model of the equipments QTY REMARK
1 FMFQ 40*2 pneumatic mill 6 pc contain motor
2 FSFS 2*12*63 plansifter 2 pc contain motor
3 TGFY-5A air lock 14 pc  
4 155*114 spiral conveyor 2 pc contain motor
5 6-30-7 style high pressure fan 1 pc contain motor
6 transmation of air lock 5 set contain motor
7 30 style bran brushing sifter 2 pc  
8 TCFK 50 packing maching 1 pc contain motor
9 TBLM-39b pulse dust filter 1 pc contain motor
10 FKB sewing sealer 1 pc contain motor
11 distributor 2 pc  
12 24 style air pump 1 pc  
     
   
 
The list of the vulnerable parts
 
   
 
NO Name Model QTY Remark
1 roller 220*400 12 pc with bearing
2 the outside sieve of plansifter 63 style 6 sieve  
3 the inside sieve of plansifter 63 style 20 sieve  
4 the brush   24 pc used in 40 pneumatic mill
5 the bearing of the mill   10 pc  
6 the bearing of the plansifter 3608 10 pc  
7 canes of the plansifter 16*1500 10 pc  
8 organic glass pipe   4 pc  
9 up pad 03 01 OOA 8 pc  
10 downs pas 03 03 OO 8 pc  
11 O-pad 0800 00 8 pc  
12 the bearing of the spiral conveyor 205 4 pc  
13 sleeve   3 pc used in pulse dust collector
14 switch CJ10-10
CJ10-40A
2 pc
2 pc
used in distributor
15 butten LA38-11/301 2 pc used in distributor
16 switch   2 pc used in distributor
17 crocher hook   10 pc used in bagging-box
18 bagging needle   10 bag used in bagging-box
19 panel of the scourer 930*270 4 pc  
20 the sieve of the scourer 640*950 1 set  
21 the bearing of the scourer 90510 2 pc  
22 V-belt of scourer B1900 6 pc  
23 sieve of grain separator 50 style 2 set  
24 the bearing of grain separator 307 4 pc  
25 glass pipe of damper   2 pc  
26 electromagnetic valve for damper   1 set  
27 the bearing of stoner 111210
206
2 pc
2 pc
 
28 the sieve of stoner 56 style 2 pc  
29 the cane of spiral conveyor 150 4 pc  
31 the hopper of the lift 110*90 50 pc  
32 the belt of the hopper width 127 20 m  
33 the screw of the hopper M6*16 100 pc  
34 the coop of the bran sieve 30 style 1 pc  
35 the brush of the bran sieve   3 pc used 30 style sieve
36 parts of packer   1 set  
37 valve of packer   3 pc  
38 the v-belt for stoner A1750 3 pc  
39 bush for stoner   2 set  
40 the rubber ring for stoner 56 style 2 set each set includ 8 pc
41 V-belt B2500
B1059
12 pc
4 pc
 
42 V-belt A1500 4 pc  
     
 
( Page 1 Page 2 )
 
 
 
Flour mill contact: Xu Haitao (Mr)
Company: Nanyang Guanghui flour machinery factory
Address: No 12 GuangWu east road Nanyang city Henan province, China.
E-mail: sales@cnnygh.com
E-mail: business@cnnygh.com
Tel : +86-377-63283232
Fax: +86-377-63220891